We've had many successes in the past week including tile installation, begining hardwood floors, iron work for balcony construction, painting...almost too many things to list so I'll stick to high level stuff.See construction progress list below.
Some great news is that we will begin hanging balconies this week starting with the support structures first then platforms which are being constructed in a climate controlled environment to maximize exact specifications before they are transported onsite via truck to 1336
It will be an awesome sight to see our crane hoist 12 huge platforms to the exterior of Skye Condos II where crews will weld them into place. I'll take pictures to post here and you;re welcome to attend. I'll announce the extac dates the platforms will be installed.
We’ve recently decided to have a Martini Party on the roof top for owners and friends in about 6 weeks when we will have several condos completed and moved-in. We want to to share in our owner’s excitement and start the evening off right before going out for a night on the town...a short walk to downtown!
Since 1996, the increase in prices for condos in metro
Last weeks successes
◊ Completed fire stop installation in all units
◊ Fire stop passed inspection
◊ Balcony wiring is prepped.
◊ Security Pre-wiring is done on bottom 2 floors.
◊ Top two floors had drywall installed
◊ Top two floors passed drywall inspection.
◊ Tile continued per scheduled unit order
◊ We received the new stairwell canopy engineering from Engineer.
◊ We received our engineering letter from regarding the unit and bedroom doors.
◊ An initial closing schedule was put together by Sales and Project Management.